Trusted By

2001

FOUNDED.

5,500+

PROJECTS COMPLETE.

OSHA

Certified Teams

Industrial Coating Systems and Applications

The Right Coating System for Your Environment. Industrial coatings are not standard paint. The right system depends on your substrate, exposure conditions, operational requirements, and regulatory environment. We assess all of it before recommending a system.

  • Epoxy Coatings
  • Polyurethane Topcoats
  • Corrosion-Resistant Systems
  • Chemical-Resistant Coatings
  • High-Temperature Coatings
  • Floor Coatings & Sealers
  • Safety & Line Marking
  • Structural Steel
  • Tank Exteriors
  • Pipe & Equipment
  • Secondary Containment
  • Waterproofing Systems

Coating Process

  • Surface assessment and substrate evaluation
  • Surface preparation to specified SSPC standards
  • Coating system recommendation in writing
  • Application per manufacturer specs
  • Dry film thickness (DFT) documentation
  • Final inspection and punch list sign-off

Safety & Compliance

  • OSHA-certified job leaders on every project
  • Confined space trained where required
  • Lift certified employees
  • Written safety plan for every project site
  • Hazard identification and elimination (I.E.P.)
  • Full PPE compliance
  • Coordination with plant safety officers

Case Study

30,000 Gallon Tanks | Aviation Company

(3) 30,000 Gallon Tank Repaint | Jacksonville, Florida

Industry: Aviation · Scope: Tank Coatings · Scale: 3 × 30,000 Gallon Tanks

Read the Full Story
How It Works

Our Industrial Project Process

01

Site Assessment

We evaluate the substrate, environment, and requirements before recommending any coating system.

02

Safety Planning

Written safety plan developed for your specific site. Coordination with your plant safety team before crews arrive.

03

Surface Prep

Prep to SSPC standards. Substrate must be correct before coating goes on. We don’t skip this step.

04

Application & QC

Coating applied per spec. DFT documented. Daily check-ins with your facility team.

05

Inspection & Sign-Off

Walk the scope with us.

Ashley Littles
Ashley Littles
05:46 03 Jun 26
Very impressed with the painting service. The work was completed with precision, and the finish looked clean and flawless. The painter was professional, punctual, and ensured everything was done to a high standard.
Allen Demo
Allen Demo
21:54 02 Jun 26
Performance Painting did a great job for us and we would have them do additional work too!
Leann Fox
Leann Fox
18:17 23 Apr 26
We have used Performance Painting twice for exterior and interior painting and continue to be extraordinarily happy with the entire team. Marc Chapman was fair and detailed with all estimates and the unexpected add ons that we requested. Frank Moreno provided outstanding personal service with amazing attention to detail , along with great team leadership that kept the project on schedule. The quality of the prep work and painting despite the challenge of 100 year old plaster and stucco walls and ceilings exceeded our expectations. Will is certainly an excellent craftsman. The respectful professionalism, talent and punctuality demonstrated by the entire crew was refreshing and we will not hesitate to use them again for future projects.
Dark Knight
Dark Knight
13:23 17 Apr 26
Maureen Fields
Maureen Fields
17:45 10 Apr 26
They did a great job three painters came out and painted all the eaves in my house. They did pressure washing beforehand and then they used high-quality paint and worked five days almost nonstop. I would highly recommend this company for any kind of painting.
Rick Wilkins
Rick Wilkins
12:23 10 Apr 26
This the second time we've used Performance Painting for an industrial project, and am very pleased with their work and professionalism. Communications prior to the work, during the work and after the work - from initial site visit for the estimate through demobilizing - were very much spot on and appreciated. They even worked with us to keep a certain part of our storage yard "clear" due to access needed by other companies needing said access during the time they were on-site with their trucks and equipment.
JOSEPH PERRUZZI
JOSEPH PERRUZZI
20:36 28 Mar 26
Lorenzo and Byron were top notch! Professional in every way, and the work was second to none!!!!
Caleb Sensanbaugher
Caleb Sensanbaugher
18:34 25 Feb 26
We used Performance Painting for a project regarding a metal ceiling on our outdoor deck at the airport. They grinded down the rust that had accumulated due to the salt water in the air and constant humidity. They then repainted and recovered the entire area. Austin and Patrick were the guys who worked for us on this project and they were very efficient with what they did. They communicated with us throughout the project and even came back to fix a minor part that was accidentally painted after work was already complete. I would highly recommend this company due to their efficiency, pricing, and communication.
Dustin islas
Dustin islas
15:26 13 Feb 26
The crew I have on site goes above and beyond expectations thank you Frankie.
Rick Anderson
Rick Anderson
17:28 20 Jan 26
Excellent job! Very detailed painters. Alberto and his team completed this project over 2 1/2 months through lots of weather challenges. Excellent day to day communications!
js_loader

Common Questions from Facility Managers and Plant Engineers

Question: Can you work around active plant operations?

Yes. We plan around your production schedule. Phased work, off-shift crews, and weekend work are all options. We’ll design the project schedule around your operational needs before we start.

What coating systems do you work with?

We work with all major industrial coating manufacturers including Sherwin-Williams, PPG, Carboline, and Tnemec. System selection depends on your substrate, environment, and performance requirements — we’ll recommend in writing before any work begins.

HOW PROFESSIONAL ARE YOUR CREWS ON SITE?

Very. Performance Painting holds strict standards of professionalism — our crews wear professional work attire, clean up as they go, and keep communication open with each other and with you throughout the project. You can count on a respectful, tidy job site from start to finish.

DO I NEED TO BE ON SITE DURING THE PROJECT?

We like you to be on site the first and last day, but the rest of the time you don’t need to be there. As part of our 5-step project management process, our Project Leader checks in with you at the end of each work day to keep you informed, and you’ll have the chance to inspect the finished work to make sure you’re satisfied.

Let's Assess Your Facility

Tell us about your project. We’ll review it and respond within one business day to schedule a site assessment.

NAME

Areas Served

Industrial coating projects across Florida and the Southeast United States. Multi-site and national accounts accommodated.